Taribani Field Unit - T#45 Well Operations Gallery, July 2007 - May 2008

 
2007: Drilling operations for 2007 are focused on three wells in order to commence development of the Zone 9 horizon in the Taribani Field. The three wells scheduled for operations in 2007 are the Dino #2 (workover/recompletion), T-#45 and Taribani South #1.
 

July - August 2007: Situated in close proximity to existing infrastructure at the Taribani Field, the new T-#45 location (below right) was prepared such that the Dynamic #1 rig could move on to it as soon as operations were completed at the Dino #2 location.
 

August 2007: Drillsite location is complete and the Dynamic #1 rig will move here after completion of Dino #2 work. The rig will be situated on this concrete pad and the wellbore will be drilled into the 'cellar' situated in the center of the picture above.
 

October 2007: The Dynamic #1 rig mobilizes to the T-#45 location, sets up, performs equipment testing and prepares for commencement of drilling operations.
 